You Are Leaving Santee.org

You are now leaving Santee Electric Cooperative's web site and are going to a web site that is not operated by us. We are not responsible for the content or availability of linked sites. Please be advised that we do not represent either the third party or you, the member, if you enter into a transaction. Further, the privacy and security policies of the linked site may differ from those practiced by Santee Electric Cooperative.

{leavelink}

Member Login Search Site Contact Santee Electric Cooperative Inc.
About Santee Electric Cooperative Inc.

Nav Location: SEC Home  >   About Santee Electric  >  Rate Schedules

 

Index of Rate Schedules

Effective May 1, 2018

Rate Description

Rate Schedule

Numerical Reference

Date Effective

Service Rules and Regulations

-- 

-- 

July 15, 2012

Residential Service

RES-B4

3,4,33,34

May 1, 2018

Residential Net Metering - Time of use retail sales

NM-TOU

-- 

May 1, 2018

General Service

GS-5

2,5,6,7

May 1, 2018

General Service High Load Factor

GS-HLF

11

May 1, 2018

Large Power Demand Service

LPD-21

21

May 1, 2018

Large Industrial Power Service

LIPS-1

-- 

May 1, 2018

Residential and General Service Net Metering Rider 

 NM

-- 

May 1, 2018

Advance Pay Rider

A

--

May 1, 2018

Seasonal Service 

Z-1

26

May 1, 2018

Area Lighting Service

AL

-- 

May 1, 2018

Public Street Lighting Service

PSL

-- 

May 1, 2018

Residential Street Lighting Service

RSL

-- 

May 1, 2018

Line Extension Policy

LEP

-- 

Revised Nov. 1, 2010

Intermittent Load Rider

H

-- 

May 1, 2018

Load Control Off Peak Service Rider

LC

-- 

May 1, 2018

Fuel Adjustment Factor

 --

-- 

 --

 
 

Contact Santee Electric About This Site Privacy Policy Terms of Use Site Map
copyright © Santee Electric Cooperative Inc. 2012-2018  •  Select Country: United States of America