You Are Leaving Santee.org

You are now leaving Santee Electric Cooperative's web site and are going to a web site that is not operated by us. We are not responsible for the content or availability of linked sites. Please be advised that we do not represent either the third party or you, the member, if you enter into a transaction. Further, the privacy and security policies of the linked site may differ from those practiced by Santee Electric Cooperative.

{leavelink}

Member Login Search Site Contact Santee Electric Cooperative Inc.
About Santee Electric Cooperative Inc.

Nav Location: SEC Home  >   About Santee Electric  >   Rate Schedules  >  Multi Purpose Sports Field Lighting

 

Multi-Purpose Sports Field Lighting Service

AVAILABILITY

This Schedule is available for lighting multi-purpose community sports fields which are normally used for baseball, softball, football, tennis, soccer and other organized competitive sports in the territory served by the Cooperative.

TYPE OF SERVICE

A sports field lighting system designed in accordance to Service Rules and Regulations and subject to the recommended photometric standards specifically for the sports field lighting application.  Service will be provide service at 60 hertz, single-phase 2 or 3 wires, or three-phase 3 or 4 wires, at Cooperative's standard distribution voltages.

SERVICE CONNECTION

Sports field lighting facilities will be installed at cost to the member for all distribution facilities extended to the customer's point of delivery excluding transformers and meter installation costs.

MONTHLY RATE

Billing Demand                                                  $1.50 per kW of Billing Demand

Kilowatt Hour Energy Charge                             $0.1042 per kWh


BILLING DEMAND

The Billing Demand shall be the maximum kW registered or computed during any 15-minutes from the Cooperative's metering facilities within the current monthly billing period. 

SERVICE PROVISONS

1)      The minimum Contract Period for service provided under this schedule shall be one (1) year.

2)      The minimum monthly charge shall not be applicable for this service.

3)      The amount calculated at the above rate is subject to be adjusted monthly by the Cooperative's projected wholesale power cost. The rate shall be adjusted by a TIER (Times Interest Earned Ratio) adjustment factor to cover wholesale power cost changes and a rate necessary to maintain TIER as set forth by the mortgage agreements between the cooperative and its approved lending agencies.

4)      Intermittent service connections and disconnections are subject to an operating service charge of not less than $25.00.

5)      Bills are due upon receipt. Bills are delinquent 22 days from the Billing Date and subject to a late payment charge on the current bill equal to ten percent (10%) of the first $25 and an additional two percent (2%) thereafter. Those unpaid after 30 days are subject to service disconnection.

6)      Service under this schedule is subject to the provisions of the Cooperative's Service Rules and Regulations.

7)      Turn-key solutions from design consultation and engineering expertise required by the Cooperative for approved sports field lighting installation.

Supersedes Schedule B-1         
Effective for bills rendered on and after September 1, 2012


<< Back to the Rate Schedules Section

 
 

Contact Santee Electric About This Site Privacy Policy Terms of Use Site Map
copyright © Santee Electric Cooperative Inc. 2012 - 2013  •  Select Country: United States of America