You are now leaving Santee Electric Cooperative's web site and are going to a web site that is not operated by us. We are not responsible for the content or availability of linked sites. Please be advised that we do not represent either the third party or you, the member, if you enter into a transaction. Further, the privacy and security policies of the linked site may differ from those practiced by Santee Electric Cooperative.

{leavelink}

Member Login Search Site Contact Santee Electric Cooperative Inc.
About Santee Electric Cooperative Inc.

Nav Location: SEC Home  >   About Santee Electric  >   Rate Schedules  >  Residential Subdivision Street Lighting

 

Residential Subdivision Street Lighting Service

Availability

This Schedule is available for lighting residential dedicated public streets within residential subdivisions.

Type of Service

A street lighting system designed to the most uniformed recommended IES street lighting standards for residential application.

Monthly Rate

The monthly billing amount for each active residential account within the subdivision will be as follows:

Overhead Street Lighting Service

Enclosed or Semi-Enclosed Fixture Mounted on Approved Wood Poles

  • LED (150W Equivalent) Roadway or Existing HID Fixtures    1 fixture per 10 accounts: $1.91

  • LED (150W Equivalent) Roadway or Existing HID Fixtures    1 fixture per 5 accounts:  $3.82

  • LED (100W Equivalent) Standard or Existing HID Fixtures    1 fixture per 10 accounts: $1.29 

  • LED (100W Equivalent) Standard or Existing HID Fixtures    1 fixture per 5 accounts:  $2.58 

Underground Street Lighting Service

Standard Post Top Fixture Mounted on Standard Decorative Poles

  • LED (150W Equivalent) Post Top or Existing HID Fixtures     1 fixture per 10 accounts: $2.35

  • LED (150W Equivalent) Post Top or Existing HID Fixtures     1 fixture per 5 accounts:  $4.71

  • LED (150W Equivalent) Post Top or Existing HID Fixtures     1 fixture per 3 accounts:  $7.85

Intermediate Post Top Fixtures Mounted on Standard Decorative Poles

  • LED (150W Equivalent) Post Top or Existing HID Fixtures     1 fixture per 10 accounts: $2.88

  • LED (150W Equivalent) Post Top or Existing HID Fixtures     1 fixture per 5 accounts:  $5.76

  • LED (150W Equivalent) Post Top or Existing HID Fixtures     1 fixture per 3 accounts:  $9.59 

Premier Post Top Fixtures Mounted on Premier Decorative Poles

  • LED (150W Equivalent) Post Top or Existing HID Fixtures      1 fixture per 10 accounts: $4.11

  • LED (150W Equivalent) Post Top or Existing HID Fixtures      1 fixture per 5 accounts:  $8.22

  • LED (150W Equivalent) Post Top or Existing HID Fixtures      1 fixture per 3 accounts:  $13.70 

WHOLESALE POWER AND TIER ADJUSTMENT

Wholesale Power costs are included in the kilowatt‐hour charges and are subject to adjustment annually.  The monthly rate will be adjusted by a factor necessary to maintain TIER (Times Interest Earned Ratio) as set forth by the Mortgage Agreements between the Cooperative and the lending agencies of RUS and CFC and as set by the Cooperative Board of Trustees.  As of May 1, 2018, the lighting adjustment is $0.0000 per kWh and is included in the rate above.

EXTENSION OF FACILITIES

Overhead facilities will be installed from existing lines in accordance with approved Line Extension Plan.

EXISTING SUBDIVISIONS

Street lighting service will be provided in existing residential subdivisions in compliance with signed petitions by all the owners of residential lots within the subdivision.  Payment for construction costs will be required in accordance with existing Rules and Regulations.

NEW SUBDIVISIONS

Street lighting service will be provided in new subdivisions with the execution of a formal URD (Underground Residential Development) agreement, including formal restrictions as executed under Restrictive Covenants that require the property owners  in  the  subdivision  to  contract  with  Santee  Electric  Cooperative  for  the  installation  and  continuing  monthly payment to Santee Electric Cooperative by each residential consumer based on the current applicable rate schedule.  As part of the URD agreement a lighting layout will be agreed upon with any additional contribution in aid to construction cost required by the developer for the purchase and installation of the lighting fixtures.  Poles and fixtures will only be installed as dictated by services being installed to residences in the subdivision.  The developer may enter into a separate agreement for the installation of any additional lighting fixtures.

Supersedes Schedule L-3
Effective for bills rendered on and after May 1, 2018


<< Back to the Rate Schedules Section

 
 

Contact Santee Electric About This Site Privacy Policy Terms of Use Site Map
copyright © Santee Electric Cooperative Inc. 2012-2018  •  Select Country: United States of America