Residential Service
AVAILABILITY
This Schedule is available only for domestic purposes to
consumers living in private households, apartments and other
residential dwelling units including its appurtenances if served
through the same meter.
TYPE OF
SERVICE
The Cooperative will provide service at 60 hertz,
single‐phase 2 or 3 wires, or three‐phase 3 or 4 wires, at our
standard distribution voltages.
MONTHLY
RATE
Basic Facilities
Charge
$0.74 per day
Energy Charge per
kWh
$0.125000 per kWh
MINIMUM MONTHLY CHARGE
The minimum monthly charge under the above rate shall be the
basic facilities charge for all members served under this rate
schedule except those members for which a higher minimum monthly
bill is required under the cooperative's standard policy because of
special circumstances by the member affecting the cooperative's
cost of rendering service. Minimum monthly billing
requirements are further explained below under Special
Provisions.
SERVICE
PROVISIONS
1) The charges computed at the above monthly
rate shall be subject to applicable South Carolina Sales Tax,
franchise fees, assessments, and surcharges imposed by any
governmental authority.
2) The minimum Contract Period for service
provided under this schedule shall be one (1) year.
3) The amount calculated at the above rate is
subject to be adjusted monthly by the Cooperative's projected
wholesale power cost. The rate shall be adjusted by a TIER
(Times Interest Earned Ratio) adjustment factor to cover wholesale
power cost changes and a rate necessary to maintain TIER as set
forth by the mortgage agreements between the cooperative and its
approved lending agencies.
4) A contribution‐in‐aid to
construction may be required to provide additional capacity
adequate to serve abnormal electrical load.
5) This rate schedule includes cost for
installed facilities adequate to serve a 200A service entrance
rating. If the Cooperative is required to install excess
facilities without anticipated additional electric usage there will
be a required contribution‐in‐aid to construction as calculated
using the approved cooperative line extension policy.
6) The Cooperative's facilities used to
provide electrical service have definite capacity limitations and
can be damaged by overloads. Therefore, the Consumer must notify
the Cooperative prior to making alterations to the service entrance
equipment so that facilities of proper capacity may be provided.
The Consumer shall be responsible for all expenses and or damages
to Consumer's facilities resulting from failure to give proper
notice. The Consumer may also be subject to a
contribution‐in‐aid of construction for work required to meet the
Consumer's alterations. The Consumer should contact the
Cooperative for information concerning charges for such work.
7) Intermittent service connections and
disconnections can be subject to an operating service charge of not
less than $30.00.
8) Bills are due upon receipt. Bills
are delinquent 22 days from the Billing Date and subject to a late
payment charge on the current bill equal to ten percent (10%) of
the first $25 and an additional two percent (2%) thereafter.
Those unpaid after 30 days are subject to service
disconnection.
9) The basic monthly bill will be increased by
$12.00 for three phase service.
10) The normal point of delivery shall be the
point of attachment at a location as designated by the
Cooperative.
11) Temporary service or construction service shall
be supplied at a single point of delivery and in accordance with
the Cooperative's Line Extension Plan.
12) Service under this schedule is subject to the
provisions of the Cooperative's Service Rules and Regulations.
Supersedes Schedule B
Effective for bills rendered on and after November1, 2010 as
revised May 1, 2019
<< Back to the Rate Schedules Section